Data Center-2

Infrastructure

Hardened and Secure Facility

  • Completed in 1995 to U.S. Department of Defense hardened data center specifications
  • Situated on five acres and bordered on three sides by earthen berms
  • 24x7x365 monitoring, unmanned lights-out facility

Redundant Power

  • Dual, redundant 275kW UPSs
  • Dual 600kW generators that activate within 7 seconds of demand to take over for the UPSs
  • Dual power strips (rack PDUs) per cabinet
  • Every cabinet gets up to 6kW (additional power available) of UPS power capacity via redundant, monitored power strips

Compute Area

  • 3,600 sq. feet of raised floor compute area, capable of housing over 14 rows of telecommunication and computing cabinet lineups
  • DC-2 provides geographic redundancy to DC-1
  • Over $9M planned in upgrades

Connectivity

  • Redundant connectivity to DC-1, and Telesystem's NOC (Network Operations Center)
  • Points of presence for multiple carriers